Free WPQ2 flashcards

12 flashcards from the “Planning” domain. Read the front, show the answer, then grade yourself. Cards you miss come back sooner when you return to this page. No signup.

0 due today12 to learn12 cards

Flashcard · Planning

Who may sit WPQ2?

Print these cards (PDF) · cut-out sheets: print double-sided, flip on the long edge

Send these free cards to a coworker.

The course has 82 cards with spaced review.It also adds every question you miss to your deck.

Terms and refunds · Secure checkout by Stripe · Billed by Nori Software

Not sure where to start? Take the free 10-question check.

All 12 cards

The same signed cards as the trainer above, in one list to read or print.

Who may sit WPQ2?
A current CWI or SCWI. It is not an option for initial CWI certification.AWS WPQ2 Endorsement Description (Cert. Rev. 11.05.2026) p.3
Which references does WPQ2 use?
AWS D1.1/D1.1M:2020 and AWS B2.1/B2.1M:2021, as PDFs without word search. Bound printed copies are allowed.AWS WPQ2 Endorsement Description (Cert. Rev. 11.05.2026) p.5
A question draws on a standard you do not have. What do you do?
Use the information in the stem. AWS gives what you need there.AWS WPQ2 Endorsement Description (Cert. Rev. 11.05.2026) p.5
What are the WPQ2 domains and weights?
Planning 30%, WPS Qualification and Testing Requirements 40%, Finalization of WPS 30%.AWS WPQ2 Endorsement Description (Cert. Rev. 11.05.2026) p.3
What are AWS's five planning abilities?
Carry out the organization's duties; pick the base and filler combination; judge processes and their essential variables; choose prequalified, test or existing WPS; plan equipment and measurements.AWS WPQ2 Endorsement Description (Cert. Rev. 11.05.2026) p.2, abilities 1 to 5
Under D1.1, who writes WPSs and has them qualified?
The Contractor.AWS D1.1/D1.1M:2020, General Requirements: responsibilities
Who sets a requirement such as weld toughness?
The Engineer, in the contract documents.AWS D1.1/D1.1M:2020, General Requirements: responsibilities
What is the Inspector's part in WPS control?
Checking that what is used in production matches what is qualified.AWS D1.1/D1.1M:2020, Inspection: Inspector's duties
What do you pull from a specification and drawing?
Code and edition, base metals and thicknesses, joints, positions, loading, any toughness requirement, and inspection.Planning checklist (our method); AWS WPQ2 ability 2
Where is the base metal list for prequalified WPSs?
The Prequalification of WPSs clause.AWS D1.1/D1.1M:2020, Prequalification of WPSs
Two listed steels of different strength: how is filler chosen?
From the filler matching table and its note on joining different groups.AWS D1.1/D1.1M:2020, Prequalification of WPSs: filler matching
The steel is not in the base metal list. What follows?
The WPS must be qualified by test.AWS D1.1/D1.1M:2020, Prequalification of WPSs; Qualification